After six months of intense construction, the integrated circuit design service data center in Electronic City successfully passed the third-party data center load testing company's acceptance this month and obtained a report confirming third-party test approval. The scope of this load testing verification included the A-zone data center area, B-zone data center area, power distribution room, battery room, and supporting infrastructure. In addition to verifying the conventional equipment of the data center, the third-party service company overcame technical challenges and conducted specialized verification for the liquid-cooled air conditioning equipment in the B-zone data center.The electrical system, HVAC system, fire protection system, weak current system, and other equipment in the integrated circuit design service data center in Electronic City all meet the design requirements and provide conditions for the installation of server equipment. This data center is located within the IC/PIC Innovation Park in Chaoyang District, Beijing, covering an area of 850 square meters. It employs dual power supply, a water-cooling and air-cooling HVAC system, and offers conditions for leasing up to 166 standard server cabinets. It can also meet the hosting and customized service requirements for non-standard equipment such as Paladin and liquid-cooled servers.